Client provides
- Chip type, application, process node and key targets
- Current stage and available material (spec, architecture, netlist, layout)
- Scope of work, target dates and budget range
- PDK/EDA licensing status and available environment
For insufficient in-house resources, block development, IP selection and integration, custom silicon and engineering support, we define the entry service, first-stage deliverables and how to start.
| Client issue | Entry service | First-stage deliverables | Recommended start |
|---|---|---|---|
| Insufficient analog, layout, verification or back-end resources | Staffing or block outsourcing | Capability-fit table, task scope, schedule and delivery list | Start with one position or a defined block |
| ADC, DAC, LDO, AFE or similar blocks need development | Analog design, IP assessment or custom block development | Technical assessment, block plan, key targets and verification plan | Technical assessment first |
| Existing IP needs selection, adaptation or integration | IP licensing advisory, integration and engineering support | IP fit list, interface requirements, process conditions and integration plan | Verify ownership, process and verification status first |
| Custom silicon must go from definition to implementation | Custom ASIC assessment and staged development | Requirement spec, architecture recommendation, resource plan, risks and milestones | Feasibility assessment first |
| Engineering support missing after design | Coordinate DFT, packaging, test and reliability resources | Work split, technical interfaces, test/package plan and acceptance requirements | Engage as needed with clear ownership |
Product, chip type, difficulties, target node
Specifications, process, interfaces, documentation, constraints
Work packages, staffing, milestones, risks, price
SOW, NDA, deliverables, acceptance, IP ownership
Implementation, stage reviews, issue closure
Deliverables, acceptance record, follow-up support
Clear targets, input documentation, boundary conditions and change mechanism.
Version control, design reviews, simulation/verification records and issue closure.
DRC/LVS/ANT/ERC, STA, IR/EM and other checks within the agreed scope.
Agreed databases, reports, scripts, waveforms, lists and acceptance criteria.
Only PDKs, models, rules and tool licences legally authorised by the client or project owner are used.
Ownership, permitted use, process and re-licensing limits verified for each IP.
NDA, access control, access logs, encryption and return/destruction of material.
We only take on chips or design data that the client owns or is legally authorised to use.
Most engagements begin with a single position or a defined block; once the fit is proven, we extend to a subsystem or the full flow.