| Design input | RTL/netlist, SDC, technology libraries, LEF/tech LEF, constraint and IP view checks | Input completeness checklist, constraint review |
| Floorplan | Die planning, IO planning, power planning, macro placement | Floorplan database, congestion and utilisation assessment |
| Synthesis & optimisation | Logic synthesis, area/timing/power optimisation | Netlist, synthesis reports |
| CTS & place and route | Clock tree synthesis, placement, routing, ECO | P&R database, congestion and DRC results |
| Timing & power | STA, setup/hold fixing, IR drop, EM, power analysis | Timing, power/IR/EM reports |
| Physical verification & delivery | DRC, LVS, ANT, ERC and final data checks | GDS/OASIS, signoff reports, delivery checklist |